Huang, Haibin and Li, Peng and Wang, Chuang and Yuan, Bingxiang and Chen, Minjie and Feng, Weimin and Bai, Bing (2021) Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure. Advances in Civil Engineering, 2021. pp. 1-8. ISSN 1687-8086
4730936.pdf - Published Version
Download (2MB)
Abstract
In order to study the vibration influence of tunnel drilling and blasting method on the built tunnel with small clear distance, taking the intersection of Zhuhai Dahengqinshan No. 1 tunnel and Zhuji urban rail tunnel as the engineering background, we used ABAQUS finite element software to conduct numerical simulation analysis on the influence of different blasting loads on existing tunnels with small clear distance in Zhuji tunnel construction. The following conclusions were drawn: the blasting construction of the tunnel under construction had the greatest impact on the vault of the existing tunnel; when the peak load was reduced by half, the stress value, vertical displacement, and resultant velocity of Mises were also reduced by half, which indicates that reducing the peak value of blasting load appropriately can ensure the safety of tunnel construction. When the peak load is 2.7 MPa, the measured and simulated values were less than the resultant velocity limit required by the specification. In addition, the relative error between the measured value and the simulated value was less than 5%, indicating the accuracy of the numerical simulation.
Item Type: | Article |
---|---|
Subjects: | STM Repository > Engineering |
Depositing User: | Managing Editor |
Date Deposited: | 31 Oct 2022 08:52 |
Last Modified: | 11 Mar 2024 05:04 |
URI: | http://classical.goforpromo.com/id/eprint/317 |